Posts tagged
#hybrid architecture
2 posts

Migration Strategy
Hybrid Architecture for Bubble Apps: Keep Bubble, Offload the Bottleneck
Your app has one bottleneck. You do not need to rebuild everything to fix it. Here are four hybrid patterns that solve the 20% Bubble cannot handle while keeping the 80% it handles well.
18 min read

Cost Analysis
When NOT to Migrate: 5 Signs Your Bubble App Should Stay on Bubble
Migration costs $20K–$60K and takes 8–16 weeks. Optimization costs $5K–$15K and takes 2–4 weeks. Here are five signs that optimization — or doing nothing — is the smarter move.
16 min read